Mid-Field Terminal a Step Closer

News

The terminal’s vast roof has a span of 1,047ft (319m).
All photos Adac

THE OPENING of Abu Dhabi’s long-awaited Dh19.1bn ($5.2bn) mid-field terminal has moved a step closer. Abu Dhabi Airports Co (Adac) said it has undertaken an intermediate full operational trial of the mid-field terminal complex (MTC), as part of the continuing development of the new structure as well as the ongoing operational readiness and airport transfer processes. The checks, which were designed to thoroughly test the new building’s capacity and facilities involved more than 800 volunteers and two aircraft from the Etihad Aviation Group.

Become a Premium Member to Read More

This is a premium article and requires an active Key.Aero subscription to view. You can also access it if you’re subscribed to one of our Key Publishing magazines.

I’m an existing member, sign me in!

I don’t have a subscription…

Why not join our community of aviation enthusiasts? Pick one of our introductory offers and access a wealth of world-class aviation content.